top of page

At the beginning of October, the Crialeïs joined the Guip construction site for some planned work, with a quote of approximately €20,000.
-Replacement of the Taillevent mast, bench, and violins
- Sanding the hull
-Caulking of the hull and deck of the be
- Antifouling
and especially unforeseen repairs which brought the total budget up to around €45,000
Change of: - the stern tube
- starboard aft foredeck
- 4 members
- 2 verandas
- 4 apostles
- 10 planks
Subsidies and donations have made it possible to cover almost all of the work.




1/45
bottom of page





